Main phases of repair in the apartment.
How to start repair works of the apartment?
The first stage of the repair of old apartments is the damage and dismantling first off of the worn out walls and partition walls, eliminating the wall and ceiling covering. This stage https://batchgeo.com/map/1034517479935f98b370bfd2757eb140 is among the most "dirty" stages of the repair work.
One more amongst the most essential and "dusty" works is the window block replacement. It is essential to do this first of all due to the fact that dirt and dust will be unallowable throughout following phases and it is restricted at all to open windows during painting and wallpaper works (large drops of the temperature level and moisture are unallowable). After installing windows and windowsills it is essential to pack them right away in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following stage is circuitry. Circuitry can be set up in walls or along the flooring. Circuitry is made inside the pipelines to guarantee electrical security and boost dependability. The pipe safeguards wiring from external damages and allows to change the wire entirely without breaking walls and floor simply by placing the brand-new wire instead of the old one.
House Painting follows the electrical wiring. The frequent mistake during the simultaneous conducting of such works happens when employees forget to lay out among the cable televisions and home painters have actually currently plastered and smoothed out the wall. As an outcome, additional works are needed to seal chases after on the completed wall. The places of the feed switch and wall outlet area and their number should be thought-out in advance. The scheme of power electrical wiring is generally included into the design project.
Later on the system must be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable and the television cable television are laid out. The power cable should not be set out near the telephone and antenna cables to avoid noise pickup and interference. The most strange moment is setting out the TV cable. In order to make 2 (or 3) TV sets in the apartment the 2nd cable television is frequently just "strongly soldered" in parallel, so the cable resistance is reduced. As a result, the display quality is weakened, numerous programs can't be gotten and etc. In order to prevent such circumstance it is needed to welcome a professional with unique equipment. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is performed concurrently in all properties, if it is possible. Hold-ups are related to the technology. Each used layer of the plaster (or completing completing) need to dry completely before the work will continue.
Works in hygienic plans and the cooking area start all at once with house painting. It is better to meet so-called "dirty" works in the top place and at the same time. In accordance with the plan of the sanitary specialist place welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then operates in sanitary arrangements are carried out according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the flooring. And at last other sanitary gadgets, mixers and devices are mounted.
After electrical wiring, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not set up during this stage in order to save their surface appearance. The finish puttying of walls is carried out all at once. The technically specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines moisture of the material.
The following stage is the procedure of fill. Fill can be made with different products-- from normal masonry cement-sand mix to self-aligning floors. The benefit of the easy mix is its cheapness, the drawback is that such mix is much harder aligned at the level and the last dry time of such fill is 40 days, only then the next phase of the work with flooring can be performed, i.e. the duration is too long. Self-leveling self-aligning floorings are a lot more pricey, however more technological. Lining up takes place nearly "automatically" i.e. fluid solution of mix is put out, then it runs and you receive the horizontal surface. The last dry time is 15 days i.e. you have substantial time economy. The system "warm flooring" is installed into the fill. If the so-called "wet procedures" are inapplicable the innovation of the dry lining up (the fill technology) is used bases for floorings with adjustable floor battens are mounted.
After fill door boxes and door are set up. Installation of doors should take into the account thickness of future flooring covering. After installation the door can be taken off its hinges and got rid of till completion of repair work or packed into polyethylene movie to secure from damages. Simultaneously ceiling can be painted and the tile can be laid in that properties where it was planned. The tile must be laid on the absolutely dry overlay.
Finishing of the floor installing depends upon the prepared covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to offer the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood gives the extra heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.
In facilities where surface covering of the floor is laminated floor covering or parquet hoard, the ordinary wallpapers are pasted (not for painting) in the first location. Then the floor covering is mounted.
If surface covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned repercussion is connected only with such scrambling process when the great amount of dust is produced. In spite of the truth that excellent floor grinders are geared up with the vacuum cleaner, the enough amount of dust is precipitated on surrounding topics including walls. Dust is very acerbic and is severely cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not absorb the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be thought about to be ended up. It is left only to set up the plinths, ornamental components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is necessary to note that the sequence of works was listed in basic and can change depending upon the guaranteed scenario-- the variety of rooms in facility, your resources, peculiarities of the construction of the multilevel premises. It is based upon sound judgment and everyone efficient in analysis can separately produce such a series.